Material Supply / Balance Sheet




วันที่:  2024-10-05
ผู้จัดทำ:  อาคม สง่าวิไลสวัสดิ์
Work Order:  TICC:DUMMY:NTB_1B01:INSTALLATION:21036350
Location:  นนทบุรี      Project Code:  I0115
ITEL Work Order:  WO2105-147956


Code
รายการ
Unit
Supply
Used
Return
หมายเหตุ
 2000016332  OFC ADSS 216C SM MULTI-TUBE G652D [#0670]
M
4,000
4000
4000-0
 2000016985  (PRJ)SPLITTER 1:4 Bare W/O Connector
EA
9
9
0
 2000017147  FTTX:HUAWEI BARE SPLITTER 1:8 BOX
EA
3
3
0
 2000017340  FTTx: CLOSURE FIBERHOME FOR 72 FUSION
EA
1
1
0
 2000017375  Cost-(PRJ)ADSS 216C [#0608][#0615][#0667][#0679]
M
16,000
10,233
1650
0--1650
 2000020335  ClOSURE,SPLITTER L1 AERIAL 60C UPTO 72C
SET
5
5
0
 2000023930  FTTX BODY NEW L2 CLOSURE SPLITTER 8 UP 16
SET
2
2
0
 TUKHDW1512M1  Sticker for Organization Cable L=10x12cm.
EA
1,600
1,600
0
 ZSPA-030131  (PRJ)In line Aerial Closure 216 core
SET
24
24
0
Contractor
Singnature : _____________________
Name : _________________________
Date : __________________________
INTERLINK Supervisor
Singnature : _____________________
Name : _________________________
Date : __________________________