Material Supply / Balance Sheet




วันที่:  2024-10-05
ผู้จัดทำ:  อาคม สง่าวิไลสวัสดิ์
Work Order:  WO2109-152382
Location:  นนทบุรี      Project Code:  I0115


Code
รายการ
Unit
Supply
Used
Return
หมายเหตุ
 2000011250  OFC ADSS 24C SM MULTI-TUBE G652D [#1907][#2455][#4072]
M
8,436
4,879
3557
0--3557
 2000014179  OFC ADSS 60C SM MULTI-TUBE G652D [#0506][#0511]
M
2,580
2,580
 2000016985  (PRJ)SPLITTER 1:4 Bare W/O Connector
EA
18
18
0
 2000017147  FTTX:HUAWEI BARE SPLITTER 1:8 BOX
EA
18
18
0
 2000017340  FTTx: CLOSURE FIBERHOME FOR 72 FUSION
EA
2
2
0
 2000020335  ClOSURE,SPLITTER L1 AERIAL 60C UPTO 72C
SET
55
54
1
 2000023930  FTTX BODY NEW L2 CLOSURE SPLITTER 8 UP 16
SET
22
22
0
 9969001493  OFC ADSS 120C SM MULTI-TUBE G652D [#0484]
M
1,726
60
1666
1666-0000
 TUKHDW1512M1  Sticker for Organization Cable L=10x12cm.
EA
150
150
0
 UFP966S22-03  SC/APC-SC/APC Simplex(2mm) Patch Cord 3M
EA
20
20
0
 ZSPA-030131  (PRJ)In line Aerial Closure 216 core
SET
7
7
0
Contractor
Singnature : _____________________
Name : _________________________
Date : __________________________
INTERLINK Supervisor
Singnature : _____________________
Name : _________________________
Date : __________________________