Material Supply / Balance Sheet
วันที่: 2024-12-23
ผู้จัดทำ: ภูมิพัฒน์ แรงครุฑ
Work Order:
WO201802-90126
Location: กาญจนบุรี Project Code: I0061
Code |
รายการ |
Price |
Unit |
Supply |
Used |
Return |
Total |
หมายเหตุ |
กองงาน |
142010116 |
Pre-Heat shrinktube for cover drop cable |
0.000 |
EA |
1 |
1 |
0 |
0.00 |
|
2102892 |
ZSPA-030077 |
Power Rating 1kcva/0.9kw-Free |
0.000 |
EA |
1 |
1 |
0 |
0.00 |
|
021811188 |
ZSPA-030108 |
Battery for UPS 1kva-Free |
0.000 |
EA |
1 |
1 |
0 |
0.00 |
|
021811188 |
OFC2C.- USO1 |
OFC-D/W 2 Core [#600001156] |
0.000 |
M |
250 |
250 |
0 |
0.00 |
250-0 |
2102892 |
142010116 |
Pre-Heat shrinktube for cover drop cable |
0.000 |
EA |
4 |
4 |
0 |
0.00 |
|
2102892 |
Contractor
Singnature :
_____________________
Name :
_________________________
Date :
__________________________
INTERLINK Supervisor
Singnature :
_____________________
Name :
_________________________
Date :
__________________________