Material Supply / Balance Sheet




วันที่:  2024-12-23
ผู้จัดทำ:  พัฒนพงษ์ ชูกุล
Work Order:  WO2405-189328
Location:  สมุทรสาคร      Project Code:  I0127


Code
รายการ
Price
Unit
Supply
Used
Return
Total
หมายเหตุ
กองงาน
 ZOFC-020023  Flame Retardant-OFC-ARSS-12F AWN-F132-M [#AWN132-M-FRP-WFR12-24010002]
0.000
M
1,350
360
990
0.00
990-000
****
 ZSPA-020049  SC(APC) Pigtail, 9/125 SM (2.0mm) 1.5m.
0.000
EA
7
7
0
0.00
****
 ZSPA-030219  Closure with Splitter 1:8 L1 AWN
0.000
EA
1
1
0
0.00
****
 ZSPA-030220  Closure with Splitter 1:8 L2 AWN
0.000
EA
6
6
0
0.00
****
 ZSPA-030238  Closure with Splitter 1:16 L2 AWN
0.000
EA
4
4
0
0.00
****
 ZSPA-020587  SC/APC-FC/UPC Simplex(2mm) PatchCord 5M
0.000
EA
3
3
0
0.00
****
Contractor
Singnature : _____________________
Name : _________________________
Date : __________________________
INTERLINK Supervisor
Singnature : _____________________
Name : _________________________
Date : __________________________


Material Supply / Balance Sheet SUM